小SAO货CAO得你舒服吗男男,色婷婷av国产精品欧美毛片,亚洲精品国精品久久99热,豆国产97在线 | 亚洲

中文版| English

Welcome to Shandong Yasheng Heavy Industry Co., Ltd. Official Website!
Home
Overview

Shandong Yasheng Heavy Industry Co., Ltd. was founded in 1990, is a scientific research. Development, manufacturing in one of the special machinery and large-scale...

about3.png
News
Products
Technology
Cases
Recruitment
Contact
Message

Announcement

Your current location:Home>Products > CQ130-60 type of cast-in-place lining machine
CQ130-60 type of cast-in-place lining machine
 
 

First, the introduction of cast-in-place lining machine

    CQ130-60 cast-in-place channel lining machine is our company engineering and technical personnel according to market needs, play mechanism of concrete molding technology research accumulated more than 40 years of successful experience, is simple construction, easy operation, high production efficiency, low labor intensity , The equipment structure is scientific and reasonable, full-featured, stable performance, high degree of automation for the target design and development of the leading areas of the new generation of channel lining machine. The use of CQ130-60 cast-in-place channel lining machine construction site pouring U-shaped, ladder, rectangular impermeable channel without the traditional construction method of the template investment and template installation removal and handling a large number of materials, can reduce construction costs by 50%.

Second, the drainage bed construction methods

1, in accordance with the slope to determine the slope of the bed and the height of the basis of stratified rolling, so that the soil density of not less than 1600Kg / m3;

2, set the channel centerline to the center line to both sides in accordance with the channel width of the release of both sides;

3, according to the size of the line and the slope of the slope than the excavation of the earth, not greater than the standard section, do not dig backfill, slightly less than the standard section is appropriate (the machine has a bed of bed repair function).

Third, the use of lining machine

1, in the shape of the channel along the bottom of the slope in accordance with the height of the slope and the lining of the laying wheel laying wheel guide rails;

2, check the lining of the various parts and screws are tightened, the lining machine laying a good guide rails, so that the lining of the guide mode, vibration mode and sliding mode and soil in the same center line;

3, connecting the wire rope and traction hook, and the rope rope pulley hook placed 30m at the top of the lining machine is fixed, put the wire rope, you must first put the clutch in a separate state, put the rope after the clutch back to the original position;

4, no load test: start the vibrator and hoist, in the case of no load to check whether the normal work of the machine, if no exception, can be prepared on the lining;

5, concrete mixing water-cement ratio to 0.44-0.48 is appropriate, aggregate particle size is not greater than the wall thickness of 1/4, gravel ratio is not greater than 44% of the stone, can add no more than 25% of cement content of coal Gray to improve the mobility of concrete, to promote the transaction, to achieve external light real. Specific according to the label and according to soil and weather and other factors;

6, lining, the filler to the silo of 2/3, the first open vibration, and then open the hoist to walk, while walking along the packing vibration, with the artificial face;

7, according to the channel level, every 4-6 meters set expansion joints together, in the lining after the concrete in the condensation before the use of portable cutting expansion joints;

8, on the shape of the concrete channel coating conservation.

 

Copyright ©Copyright (C) Shandong Yasheng Heavy Industry Co., Ltd. All rights reserved. 2002-2018 ICP: 08000463; 魯ICP備10022443號-6

Address: Gaomi City, Shandong Province, Yi'an Road, Middle Road, No. 4399 (Gaomi City, high-speed intersection 5 km south of the road east) 

National free hotline: 400-050-9488 (machine)  400-649-6388 (water machinery)   Fax: 0536-2334888

Technical support: enterprise network

技術支持



国产成人精品无码免费播放| 与动人物姣配xxxx| 一本精品中文字幕在线| 免费观看18禁无遮挡真人网站| 亚洲国产精品无码久久九九大片| 狠狠综合久久无码AV网站| 婷婷精品国产亚洲av在线观看| 狠狠色噜噜狠狠狠777米奇小说| 越看水流的越多的故事| 国产成人亚洲精品无码车A| 中学生广播体操舞动青春| 国产精品 视频一区 二区三区| 激情五月色综合国产精品| 国产精品久久久久jk制服| 嗯啊小sao货奶头好硬视频| 欧美成人少妇激情视频112| 国产午夜片无码区在线播放| 女人高潮抽搐喷液30分钟视频| 精品视频一区二区三区在线观看| 日本乱偷中文字幕| yd双性学生授乳荡奶头| 99久久精品国产亚洲av| 日本少妇XXX做受| 噗呲噗呲捣出白沫蜜汁| 喘声2分30秒戴好耳机| 久久人人槡人妻人人玩夜色av| 特级毛片WWW| 无码人妻精品一区二区三区蜜臀| 成人欧美日韩一区二区三区 | 免费视频完整版软件下载| 国产精品内射后入合集| 久久精品国产亚洲av麻豆不片| 色情欧美片午夜国产特黄| 东北粗口国产床| 公的下面好大弄得我好爽| 男女多p混交群体交乱| 专干老熟女a片| 在线观看国产精品| 国产福利视频| 亚洲精品第一国产综合野草社区 | 少妇被三个黑人4p到惨叫 |